Interior + change before completion
where Hvozdná
when june 2020
what interior study, change before construction is completed
who Adam Bednařík
The purpose of the redesign of the house was to reduce the original mass to the height of the surrounding buildings, where there are mainly single-story buildings.
Another goal was to simplify the layout solution - connecting the floors and adjusting the clear heights (raumplan). The windows were placed in the context of views through the house - illumination of the house.
A complete change of layout is on the second floor - removal of unnecessary storage spaces, which have been replaced by a living room. The wish of the investor was a gallery that was created around the staircase.
X
The original curved reinforced concrete staircase was replaced by a simple straight open staircase.
The truss system was replaced by a rafter system - this enabled the creation of a high open space above the gallery.
The original construction system of the ceiling (beams) was replaced by a continuous plate with a height of 200 mm - this created a clean suspended ceiling in the kitchen and other living rooms without high beams across the building.
These changes in mass and structural solution led to a significant reduction in the financial costs of the building - by approximately 25%.
original mass:
- shield height: +8,550
- mass volume: 1050 m3
- expected price cca 6,3 mil.
- height of lower mass: +3,900
- storage areas
- curved reinforced concrete staircase
- high drafts across the building
2. e.g
new solution:
- shield height: +7,450
- mass volume: 828 m3
- expected price cca 4,9 mil.
- height of lower mass: +3,550
- straight open staircase
- open gallery 2nd floor
- continuous board (200mm), clear suspended ceilings
cut